Three-binary architecture: os-console, os-totebox, os-orchestration
Maintained by PointSav Digital Systems. Each revision is content-addressed by its commit hash.
- Track-B documentation wave: architecture category — 4 REWRITE (wikilink bug, R9 undefined Sovereign x2, ES parity restore), 1 MERGE, 1 miscategorized article moved to substrate
- docs(documentation): fix 147 broken wikilinks -- console-os/os-totebox word-order typos (71 occurrences), path-style syntax errors, stray topic- prefixes, PPN/os-console/service-fs/GIS alias-consolidation retargets (57 occurrences), plus 14 links converted to plain text or proper category links where no wikilink target applies (2 flagged as genuine content gaps: app-mediakit-shell has no article; mount is TOML syntax, not a slug)
- editorial(architecture): fix three-binary-architecture cartridge table (Track-B) — confirmed against real os-console/src/main.rs and app-console-keys/src/fkey.rs: only 7 of 12 labeled F-keys have a registered cartridge (People/Email/Content/Search/SLM/System/Input); Bookkeeper/BIM/GIS/Mesh are reserved labels with no wired cartridge despite app-console-bookkeeper existing as an active crate; also fixed a missing F5/Search row and a pre-existing duplicate-body-H1 lint ERROR; EN+ES
- fix(index-group): resolve orphaned articles across 8 categories, add infrastructure's Compute and VM fabric group
- fix(trademark): remove redundant inline trademark statement from 7 TOPIC articles (14 files EN+ES) — the persistent site footer already renders this notice on every page; disclaimers.md/page-disclaimer.md/README.md correctly keep it, not touched. Pre-existing body-H1 lint errors on 8 of these files are unrelated, not introduced by this change.
- fix(frontmatter): short_description band-fit to house style (120-180 chars) — architecture/ (final category, 148/148 complete)
- Phase C A1d: topic-* batch complete — 4 merges into canonical articles (+ content backfill), 4 prefix-drop renames, 2 merge-checks resolved (capability-geometry, private-git-paid-customer-endpoint); research/ seeded (preprint-notice-convention + landing cleanup). Track A (documentation) complete.