| d046f96 | Peter Woodfine | 2026-05-06T17:00:20+00:00 | content-wiki-documentation: commit cleanup-log entries for Phase D/E batch and bim-leapfrog sweep | |
| 0a5b96f | Peter Woodfine | 2026-05-08T19:29:59+00:00 | Step 5 priority 4c remainder (frontmatter+lead): 4 moved articles in architecture/ | Follow-up to the previous rename commit. The renames landed at 100% similarity because the post-mv frontmatter and lead edits were not staged before the commit. Staging them now.
Per article (EN + ES pair):
- article-shell-leapfrog: schema foundry-topic-v1 → foundry-doc-v1; added title/slug/type/quality/short_description/editor/paired_with; category applications → architecture; lead consequence-first.
- knowledge-wiki-home-page-design: same schema upgrade; lead opens with the two-reader claim and Wikipedia Main Page inheritance.
- wikipedia-leapfrog-design: same; lead consolidates the 95%/5% muscle-memory framing.
- location-intelligence-ux: schema already foundry-doc-v1; body H1 removed (content-contract.md §5.2); category applications → architecture; lead opens with Conclusion-First philosophy.
last_edited bumped to 2026-05-08 across all 8 files. Stage 6 to canonical pending. |
| 9c805a1 | Jennifer Woodfine | 2026-05-06T16:50:53+00:00 | content-wiki-documentation: update flat-file-bim-leapfrog topic with richer draft content | - Expanded standards-stack maturity section (IFC 4.3/ISO 16739-1:2024, IDS 1.0, BCF 3.0, CityJSON 2.0)
- Extended format table (COBie, hash-addressed object store, SVG, CityJSONSeq)
- Added government regulatory acceptance section (US federal, EU, UK, Singapore, Dubai)
- Added trade-offs section (real-time collaboration, city-scale federation, generative AI)
- §6 applied: all named competitors genericized (structural positioning only)
- Body H1 removed per content-contract §5.2
- ES strategic-adaptation refreshed with regulatory posture and trade-offs
- Source: project-bim draft (Doctrine claim #40 — Flat-File BIM Substrate) |
| dc9acec | Jennifer Woodfine | 2026-05-08T19:29:33+00:00 | Step 5 priority 4c remainder: 4 design-intent articles → architecture/, location-intelligence-platform refined, launch announcement retired | Reclassification + cleanup pass on the 6 remaining applications/ articles.
**Moved to architecture/** (4 EN+ES pairs, 8 files):
- article-shell-leapfrog (cross-cutting design pattern: 5 article-shell primitives beyond Wikipedia)
- knowledge-wiki-home-page-design (design intent for documentation.pointsav.com home page)
- wikipedia-leapfrog-design (95%/5% muscle-memory contract for the wiki chrome)
- location-intelligence-ux (Conclusion-First design philosophy for the GIS interface)
Schema upgrade foundry-topic-v1 → foundry-doc-v1 on all 4 (3 needed it; location-intelligence-ux was already foundry-doc-v1). Body H1 removed where present (location-intelligence-ux). Lead consequence-first per draft 2 of 10. last_edited 2026-05-08.
**Refined in place** (1 EN+ES pair, 2 files):
- applications/location-intelligence-platform — body H1 removed; lead now names the two component apps explicitly (app-orchestration-gis + pointsav-gis-engine) and points to co-location-methodology.
**Retired** (1 EN+ES pair git rm'd):
- applications/documentation-pointsav-com-launch-2026-04-27 — historical launch event from 2026-04-27 16:25 UTC (workspace v0.1.29). CHANGELOG.md captures the event; the live URL is the canonical record. The slug's date suffix marked it as a one-off, not a standing topic. Inbound wikilinks scrubbed (app-mediakit-knowledge See Also EN+ES — replaced with article-shell-leapfrog reference).
After this commit:
- applications/ retains 4 canonical app-* topics (app-mediakit-knowledge, app-mediakit-marketing, app-orchestration-gis) + location-intelligence-platform.
- architecture/ gains 4 design-intent siblings to compounding-substrate, doorman-protocol, etc.
Closes Step 5 priority 4c. Stage 6 to canonical pending. |
| 8e92790 | Jennifer Woodfine | 2026-05-06T04:34:32+00:00 | Phase E: bcsc_class + status sweep — services/, systems/, infrastructure/, reference/, design-system/ | |
| 5880bd0 | Jennifer Woodfine | 2026-05-08T18:33:43+00:00 | cleanup-log: archive 14 detailed Closed entries from 2026-05-08 session sweep | Per the existing pattern (brief summary list in cleanup-log.md, full session-note text in cleanup-log-archive.md), moving the detailed Closed entries that accumulated during this session out of the rolling log.
cleanup-log.md (was 132 lines, now 82): Closed section now contains 20 brief one-line summary entries spanning 2026-04-23 through 2026-05-07. Open section preserved (the active Step 5 entry with all current commits).
cleanup-log-archive.md (was 25 lines, now 87): prepended 14 detailed entries (newest-on-top per pattern) — 2026-05-07 root-layout-defects through 2026-04-23 upstream-remote.
No content lost. Pure file reorganisation. |
| 2029518 | Peter Woodfine | 2026-05-06T04:34:29+00:00 | Phase E: bcsc_class + status sweep — architecture/, governance/, applications/ | |
| 5f17aa1 | Jennifer Woodfine | 2026-05-08T18:20:04+00:00 | Step 5 priority 4c — applications batch: 2 EN+ES pairs register-corrected | applications/app-mediakit-marketing.md + .es.md — short_description added; lead reframed consequence-first leading with the structural property (single statically-compiled Rust binary, no PHP/MySQL/plugin infrastructure) before the WordPress muscle-memory framing; named both live tenants (Woodfine + PointSav) explicitly. last_edited bumped to 2026-05-08.
applications/app-orchestration-gis.md + .es.md — short_description added; lead tightened to put the "pure function, no canonical data, re-provisionable" property in the lead paragraph rather than a dedicated section. last_edited bumped to 2026-05-08.
Combined with 500f201 (app-mediakit-knowledge) this closes priority 4c for the three named app-* Nomenclature entities. Other applications/ articles (article-shell-leapfrog, knowledge-wiki-home-page-design, location-intelligence-platform/ux, wikipedia-leapfrog-design, documentation-pointsav-com-launch-2026-04-27) remain pending — different content type (design specs / launch announcements) than the canonical app-* topic articles.
Stage 6 to canonical pending — flag to Master at session close. |
| 5d5f205 | Jennifer Woodfine | 2026-05-06T04:33:29+00:00 | Phase D: Spanish pairs for services/ + systems/ categories (10+6 files) | |
| dcec4f6 | Jennifer Woodfine | 2026-05-08T18:15:40+00:00 | Stage 6 reconciliation merge: integrate 5 canonical commits into cluster main | Resolves 7 conflicts per command@claude-code routing decision (inbox 2026-05-08T17:30Z):
- applications/user-guide-2026-03-30-v2.md — respected canonical delete (c2b7ac9 root cleanup; cleanup-log already noted both files as defects)
- infrastructure/guide-telemetry.md — respected canonical delete (same reasoning)
- architecture/flat-file-bim-leapfrog.md — accepted canonical's cites: [ifc-4-3, iso-19650]; dropped canonical's accidentally misplaced See Also block (already exists at file end)
- reference/bim-aec-muscle-memory.md — accepted canonical's cites: [ifc-4-3, uniclass-2015, bsdd-v1]; same See Also fix
- reference/bim-design-philosophy.md — accepted canonical's cites: [ifc-4-3, uniclass-2015, bsdd-v1]; same See Also fix
- reference/bim-token-taxonomy.md — accepted canonical's cites: [ifc-4-3, uniclass-2015, bsdd-v1, dtcg-w3c]; same See Also fix
- .agent/rules/cleanup-log.md — concatenated chronologically: kept HEAD's expanded Step 5 entry in Open; closed the 2026-05-06 climate-zone-tokens routing entry (resolved at commit 15d0942 + a928b70 in prior session); merged the duplicate Closed sections into one with archived-summary list at the bottom
Canonical commits integrated: 41210a8 (BIM cites), f878949 (Gemini CLI merge), 680afd1 (cleanup-log defects), c2b7ac9 (root cleanup), e6d5f15 (cleanup sweep).
Cluster commits preserved: aad5c7d, 09637ed, ad88bc3, 1868a20, e7b14c3, 11d617a, 3cbf3c7, 500f201, plus prior session 96e221d, 91b8910, f470a11, 6d0e638.
After this merge: push staging-j + staging-p; flag Master via outbox for canonical promotion (~/Foundry/bin/promote.sh). |
| 088491b | Peter Woodfine | 2026-05-06T04:33:22+00:00 | Phase D: Spanish pairs for architecture/ + governance/ categories (9+3 files) | |
| 500f201 | Jennifer Woodfine | 2026-05-08T18:09:17+00:00 | Step 5 priority 4c (in-flight): app-mediakit-knowledge — schema upgrade + lead tightening | Frontmatter normalisation: foundry-topic-v1 → foundry-doc-v1; status "published" → "active"; added title, slug, type, quality, short_description, editor, paired_with fields. Removed 3 empty trailing references list entries.
Lead tightened: combined the "engine is a view, not a repository" framing with the launch fact (2026-04-27 16:25 UTC) into a single consequence-first paragraph. Body structure preserved.
Phase 4c paused mid-batch to action high-priority command@ inbox message (Stage 6 7-conflict merge — your-action item). |
| e6d5f15 | Peter Woodfine | 2026-05-08T00:29:01+00:00 | cleanup sweep: close all stale log entries; 4 red-link bilingual stubs; content-contract §4 index.md example; NEXT.md updated | |
| 2055218 | Jennifer Woodfine | 2026-05-06T02:49:19+00:00 | main page: status active, add design-system to lede enumeration | |
| 3cbf3c7 | Peter Woodfine | 2026-05-08T18:05:16+00:00 | cleanup-log: record 2026-05-08 next-session sweep — Master batch + Step 5 priority 4b complete | Updates the 2026-05-08 entry to record this session's commits:
- Master batch: aad5c7d, 09637ed, ad88bc3, 1868a20 (5 TOPICs + favicon-matrix EN+ES pairs)
- Step 5 priority 4b: e7b14c3 + 11d617a (12 services-remaining EN+ES pairs)
Adds open item: zero-container-inference.md "What this rules out" section names
competitors by product (Cloud Run, Kubernetes, SkyPilot, cargo-chef) — workspace §6
violation surfaced via project-intelligence inbox triage, not actioned in current scope.
9 Stage 6 promotions pending to canonical. |
| c2b7ac9 | Jennifer Woodfine | 2026-05-08T00:03:00+00:00 | root cleanup: YAML records → bilingual stubs; delete bad files; bim-market-context; update repo-layout + cleanup-log + handoffs | |
| 1eeb473 | Peter Woodfine | 2026-05-06T02:05:04+00:00 | cleanup-log: record 2026-05-06 project-editorial session (GIS services + design-system/ category) | |
| 11d617a | Jennifer Woodfine | 2026-05-08T18:03:48+00:00 | Step 5 priority 4b — services batch 2: 6 EN+ES pairs register-corrected + frontmatter normalized | Lead-only refinement plus structural frontmatter fixes:
- fs-anchor-emitter — type changed from "guide" to "topic" (article describes what the component does, not operational runbook); added category, short_description, last_edited, editor, status, quality fields. Lead consequence-first; "Overview of Operation" section folded into the lead.
- service-fs-security-compliance — added category, last_edited, editor, status, quality, short_description fields. Lead foregrounds the structural-vs-policy distinction (compliance follows from architecture, not configurable controls).
- service-fs-data-lake — short_description + paired_with added; lead names the two landing zones (retail / civic) explicitly.
- service-slm-totebox-sysadmin — vocabulary retirement: "Compounding Doorman" → "access-control gateway, also referred to as the Doorman" on first use.
- template-ledger — schema upgraded foundry-topic-v1 → foundry-doc-v1; status "published" → "active"; type, quality, short_description, paired_with, cites added.
- pointsav-gis-engine — body H1 removed (content-contract.md §5.2 violation: title is renderer-supplied from frontmatter); short_description + paired_with added; "sovereign" replaced with "customer-owned" per BCSC posture ("sovereign" is retired in favour of "independently verifiable / operator-controlled").
All 12 files: last_edited bumped to 2026-05-08. Stage 6 to canonical pending.
Closes Editorial Reference Plan Step 5 priority 4b — services-remaining (12 articles). |
| 680afd1 | Peter Woodfine | 2026-05-07T23:48:38+00:00 | cleanup-log: log two root layout defects (guide-proofreader-distillation, topic-radical-proofreader-ui) | |
| 0bf2f6d | Jennifer Woodfine | 2026-05-06T02:04:20+00:00 | design-system/ category: new wiki section with 6 bilingual foundation topics + 16 component guides from project-design exports; DTCG token vocabulary, HTML+CSS+ARIA recipes, WCAG accessibility specs; named competitor refs stripped per editorial review | |
| e7b14c3 | Peter Woodfine | 2026-05-08T18:00:32+00:00 | Step 5 priority 4b — services batch 1: 6 EN+ES pairs register-corrected | Lead-only refinement per Editorial Reference Plan calibration ("draft 2 of 10"):
- service-people, service-extraction, service-search, message-courier — Pattern A: redundant short_description blockquote removed; lead tightened to consequence-first; Ring 1/2/3 retained per services-topic exemption (architecture being defined).
- service-business-clustering, service-places-filtering — Pattern B: short_description added (was missing); paired_with field added; lead tightened with concrete thresholds (100 m proximity for clustering, 50 staffed beds + 1000 FTE for filtering).
All 12 files: last_edited bumped to 2026-05-08. Body structure preserved per "do NOT restructure" rule. Stage 6 to canonical pending — flag to Master. |
| f878949 | Gemini CLI | 2026-05-07T23:48:22+00:00 | Merge remote-tracking branch 'origin/main' | |
| 4d5a499 | Peter Woodfine | 2026-05-06T02:04:11+00:00 | GIS service topics + bcsc/competitive editorial fixes: add app-orchestration-gis bilingual pair, service-business-clustering, service-fs-data-lake, service-places-filtering; fix location-intelligence-ux bcsc_class (internal→public-disclosure-safe); remove named vendor from pointsav-gis-engine §Flat-File Substrate | |
| 1868a20 | Peter Woodfine | 2026-05-08T17:46:49+00:00 | Phase 4: governance/favicon-matrix EN+ES pair — vendor steel-blue square + customer Woodfine blue circle | governance/favicon-matrix.md + .es.md — inline SVG data URI rationale (zero HTTP requests, resolution-independent rendering); two-mark entity assignment (vendor steel-blue square #869FB9 / customer Woodfine blue circle #164679); BCSC no-disclosure-implication; Bloomberg-standard prose replacing original "utilizes high-fidelity SVG data URIs" stuffy phrasing.
Source draft was provenance-verified at GATE 1: misplaced from pointsav-media-assets root (already removed 2026-05-07 per draft frontmatter). Target path corrected from "content/governance/" (3-level depth, contract-violating) to "governance/" (depth-2 per content-contract.md §2). Refined from project-design draft authored 2026-04-20 by ps-administrator. |
| 41210a8 | Peter Woodfine | 2026-05-07T23:47:19+00:00 | BIM articles: add cites frontmatter (ifc-4-3, uniclass-2015, bsdd-v1, ids-1-0, iso-19650, dtcg-w3c) + fix wrong eupl-1-2 on open-bim-regulatory-acceptance | |